2022 Pavement Improvements Project (construction)

Summary

BID OPENING

City received a total of 8 bids from a low of $1,295,295.00 to a high of $2,040,000.00 on August 23, 2022. See attached apparent bid results from all 8 bidders. City appreciates all contractors for their time and effort in preparing and submitting the bids for City's consideration.

Posted:    August 23, 2022

 

BID ADDENDUM NO. 2

BID ADDENDUM NO.2 is issued on 8/19/2022. See attached for downloading. Bidders must read the complete addendum for details.

Posted:    August 19, 2022

 

BID ADDENDUM NO. 1

BID ADDENDUM NO.1 is issued on 8/13/2022. See attached for downloading. The bid due date is changed to August 23, 2022. Bidders must read the complete addendum for details.

Posted:    August 13, 2022

 

The City of Newberg (the “City”) is soliciting bids for pavement improvements to E. Sherman Street from N. School Street to N. Meridian Street, and to N. Brutscher Street from OR99W to E. Hayes Street, and all associated work such as, but not limited to, pavement marking and striping, and minor drainage improvements (the “Project). Contractor is required to secure two ODOT permits (one for OR219 or N. College Street at E. Sherman; and the other for OR99W or E. Portland Road at N. Brutscher) and follow the ODOT permit conditions and requirements.

The anticipated cost to construct the Project is between $1.3M and $1.7M. The estimated length of construction of the Project is 2,260 linear feet. The City reserves the right to reduce the scope of work to meet available fiscal budget. The construction of the Project shall be substantially complete by May 30, 2023 and the final completion date shall be June 27, 2023.

Complete bid documents can be obtained at https://bids.newbergoregon.gov/ and viewed at Newberg City Hall, 414 E. First Street, Newberg, Oregon 97132. Bids labeled for this project "2022 Pavement Improvements Project" must be delivered to the following City office no later than 2:00 pm local time on Tuesday, August 16, 2022:

City of Newberg, City Hall
Attn: Paul Chiu, PE Senior Engineer/Project Manager
414 E. First Street
Newberg, OR 97132

Bids will be publicly opened at the above-noted location immediately following Bid Closing. Late bids will not be considered. First Tier Disclosure must be delivered to the same City office within two hours of Bid Closing to be responsive.

The contract awarded under this invitation to bid is subject to the payment of BOLI prevailing wages under ORS 279C.800 to 279C.870. 

Prequalification of bidders is required. Bidders must be prequalified to perform work in the following classes:  Aggregate Bases, Asphalt Concrete Paving & Oiling, Earthwork & Drainage, Miscellaneous Roadway Facilities, Pavement Markings, Signing, Temporary Traffic Control, and Traffic Signals along with subcontractors performing these work items. Each bidder is required to submit a completed Contractor’s Prequalification Application Form that can be found at www.newbergoregon.gov/engineering/page/contractors-prequalification-appl.... Applications for prequalification must be filed at the address listed in this notice for delivery of bids or via email at Engineering@newbergoregon.gov no later than 2:00 PM local time on August 10, 2022.

There is no pre-bid meeting for this project. All bidders shall submit their last questions through the same bid management website no later than 2:00 PM local time on August 10, 2022.

Published:    July 22, 2022 in the Oregon DJC and posted on City of Newberg Bid Management website.

Bid/RFP Results

APPARENT BID RESULTS FROM LOW TO HIGH:

1. Eagle-Elsner, Inc.                      $1,295,295.00

2. Lawson Corp                             $1,442,599.60

3. K&E Excavating, Inc.                 $1,582,966.00

4. Knife River Corp - Northwest     $1,610,608.00

5. Kerr Contractors Oregon, LLC.  $1,669,997.20

6. Moore Excavation, Inc.               $1,889,623.50

7. Kodiak Pacific Construction Co.  $1,895,895.20

8. Pacific Excavation, Inc.                $2,040,000.00

Reference #

703000

Status

Closed - no longer accepting bids and proposals

Due Date

Tue, Aug 23rd, 2022 2:00pm

Details and Notifications

To view more information, respond to this opportunity, or receive email notifications of updates, you must be logged in.

Bid/RFP Results

APPARENT BID RESULTS FROM LOW TO HIGH:

1. Eagle-Elsner, Inc.                      $1,295,295.00

2. Lawson Corp                             $1,442,599.60

3. K&E Excavating, Inc.                 $1,582,966.00

4. Knife River Corp - Northwest     $1,610,608.00

5. Kerr Contractors Oregon, LLC.  $1,669,997.20

6. Moore Excavation, Inc.               $1,889,623.50

7. Kodiak Pacific Construction Co.  $1,895,895.20

8. Pacific Excavation, Inc.                $2,040,000.00

 

Questions for this RFP

There is not an estimated mobilization date for this project. The dates for substantial and full completion were stated correctly in the Notice of Invitation to Bid but not in SPECIAL PROVISIONS No. 1. This project shall be substantially completed on or prior to May 30, 2023, and all work shall be fully completed on June 27, 2023.
You will find the published answer to this question. Let me repeat it below: The dates for substantial and full completion were stated correctly in the Notice of Invitation to Bid but not in SPECIAL PROVISIONS No. 1. This project shall be substantially completed on or prior to May 30, 2023, and all work shall be fully completed on June 27, 2023. - Project Manager 8/1/23.
City staff is working on a bid addendum to provide additional information on liquidated damages.
According to ODOT, there isn’t a fee for the permit at ODOT.